THE BUCCINI POLLEN GROUP
CHRISTINA LANDING PARKING GARAGE
WILMINGTON, DELAWARE
Simon Design redesigned the all precast parking garage to meet the demanding schedule and tight budget. This 150,000 square feet, eight-level parking structure includes a terrace level and was originally designed as an all precast structure to service adjacent residential towers. To accommodate the assembly use area and a swimming pool on the roof, Simon Design Engineering was introduced to re-design the structure using a structural steel frame and precast concrete deck to meet the Owner’s schedule requirements and budget.
Partnering with The Berlin Steel Construction Company, a turn-key solution was provided that maintained the architectural intent of the original design which included a metal screening material. The facility was designed to accommodate portions of the foundation system which had already been constructed for the original design. A tight site and construction schedule were ideal for a prefabricated solution.